### PROJECT OVERVIEW

BintangGas has successfully executed a major bulk tank and manifold system installation for the industrial gas infrastructure at the BlueScope Factory located in Kapar, Klang, completed in February 2026.

### SCOPE OF WORK

Our specialized engineering team managed the comprehensive supply, delivery, and precision installation of the heavy-duty storage tanks and associated industrial gas piping networks. A primary focus of this project was setting up robust manifold systems to ensure seamless gas distribution, high-pressure stability, and safe integration with the plant’s heavy manufacturing operations.

### SAFETY & COMPLIANCE

To guarantee optimal performance, reliability, and absolute safety, the project concluded with rigorous pressure testing, leak verification, and comprehensive system commissioning. Every phase was executed in full compliance with strict industrial safety standards, providing the client with a secure and fully certified gas infrastructure.