









### PROJECT OVERVIEW
BintangGas has successfully executed the complete LNG supply system and LNG gas tank installation for our client’s industrial facility, officially commissioned in February 2026.
### SCOPE OF WORK
Our specialized engineering team managed the end-to-end supply, delivery, and professional installation of the heavy-duty LNG storage tank infrastructure and its associated piping network. A primary focus of this project was ensuring the seamless integration of the new tanks with the premises’ existing gas operating systems. This strategic configuration provides a highly efficient, stable, and uninterrupted Liquid Natural Gas (LNG) supply for their high-capacity daily operations.
### SAFETY & COMPLIANCE
To guarantee optimal performance, high energy efficiency, and absolute safety, the project concluded with rigorous pressure testing, thorough leak checks, and comprehensive system verification. Every phase was executed in full compliance with strict industrial safety standards, providing the client with a highly reliable and leak-free gas infrastructure.