Project and Testimonial

01. Factory – LPG Bulk Tank

PTI
PTO – ON GOING

  • Bulk tank system 2x62KL, 6 units of Evaporator and 2 units of Oil Separators and Petroleum Gas Pipeline System Liquid (LPG) Up to Burners
  • Filler Valve
  • Hydrostatic relief Valve
  • Ball Valve
  • Back Check Valve
  • Vapour Equalizing Valve
  • Emergency Shut Off Valve
  • Excess Flow Valve

02. Laundry – LPG

ATI
ATO
PGL

  • Gas Manifold System 2 x 6 x 50 kg Gas Cylinder
  • Gas Piping System
  • Gas Detector System and Control Panel
  • PGL application included for the first registration by contractor
  • Renewal PGL services and 2years Safety Inspection System services

03. Residential - LPG

ATI
ATO

  • Pipe works (relocate from existing gas point to new gas point until final connection)
  • Stainless steel box control and valve butterfly
  • Gas detector
  • Rubber hose connection to final connection (stove)
  • Hacking work
  • Removing bulk tank and built gas room for 23 gas cylinder
  • Excavation works & earth works for new gas pipe routine
  • Commissioning works with Gas Malaysia technician

04. Restaurant – NG

ATI
ATO

  • Natural gas piping system after meter
  • Final connection to kitchen equipment
  • ON/OFF Label sticker attached

05. Lab - LPG

ATI
ATO

  • Natural gas piping system after meter
  • Final connection to kitchen equipment
  • ON/OFF Label sticker attached